台中Gas1&2 is classified under Fuel Oil in Taipower's open dataset, currently reporting 1 unit(s): 台中Gas1&2.
台中Gas1&2
Real-time generation & historical load curve
Source: Taipower Open Data Download Service
Plant Overview
Taichung Gas 1&2 are fuel-oil gas turbine units located within Taichung Power Plant's site in Longjing District, Taichung City, alongside the plant's coal and combined-cycle gas units, typically dispatched for peak or reserve needs.
Taichung Gas1&2 are gas turbine units from the plant's first construction phase, commissioned in 1990 alongside two sister units, each rated at around 70MW. These units start up quickly and dispatch flexibly, but cost more to run than the coal-fired and combined-cycle units, so they are mainly reserved for peak demand or emergency backup.
台中Gas1&2 (Fuel Oil) currently reports a net generation of 0 MW across 1 unit(s), against an installed capacity of 140 MW (0% utilization).
Fuel-oil and diesel units can start up quickly but have a high fuel cost, so they mainly serve as peaking or emergency reserve capacity. They typically run few hours per year, coming online more often only when system reserve margins are tight or other units are down for maintenance or repairs.
Fuel oil was an important peaking source before gas infrastructure became widespread. As LNG terminals and gas units have come online, its share has shrunk substantially, and it now mainly serves as system reserve and peak-support capacity.
Overlay Comparison
Compare load curves and daily peak trends across periods; unlocks automatically once enough data accumulates.
Unit Details
| Unit | Fuel Type | Capacity | Net Generation | Utilization | Note |
|---|---|---|---|---|---|
| 台中Gas1&2 | Fuel Oil | 140 MW | 0 MW | 0% | — |