烏溝蓄水塘

ID: 50109Offshore islandsOff-stream Reservoir

Real-time conditions and historical storage trends

Observed at: Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

Facility OperationRegular Monitoring
N/A

Effective capacity: 2.7 10k m³ (Desilting & flood regulation) · Run-of-river facility · Primarily raises river level for diversion/water supply without storage ratio monitoring

烏溝蓄水塘 real-time hydraulic engineering cross-section烏溝蓄水塘 is a run-of-river facility or weir operating with steady throughflow regulation without storage percentage monitoring.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

烏溝蓄水塘 (Off-stream Reservoir) is a major hydraulic facility managed under the Water Resources Agency. Primary water supply covers Agricultural farms in Qimei Township, Penghu.

烏溝蓄水塘 (ID: 50109) is an official Off-stream Reservoir situated in the Wugou Runoff System, Qimei Island, operated and managed by Qimei Township Office, Penghu County. In operation since 1999, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

Primary functional purposes include Agricultural Irrigation, Rainwater Harvesting & Emergency Backup, with key regional supply coverage extending across Agricultural farms in Qimei Township, Penghu.

Primary Supply Area:Agricultural farms in Qimei Township, Penghu
Agricultural IrrigationRainwater Harvesting & Emergency Backup

Effective storage

N/A

— 0.0 10k m³ (1 hr)

Water level

N/A

— 0.0 m (1 hr)

Inflow

N/A

— 0.0 m³/s (1 hr)

Total outflow

N/A

— 0.0 m³/s (1 hr)

Effective capacity

2.7 10k m³

Net Flow Balance

烏溝蓄水塘 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
N/AUpstream catchment runoff inflow rate
Total outflow (Qout)
N/AGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

All discharge gates closed (No flood release)
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

烏溝蓄水塘 · Engineering profile and geospatial information

Managing AgencyQimei Township Office, Penghu County
Responsible for facility operation and flood dispatch
Facility TypeOff-stream Reservoir
Dam structure and engineering classification
River SystemWugou Runoff System, Qimei Island
Primary catchment river basin and hydrological system
Effective capacity2.7 10k m³
Maximum designed water storage capacity of the dam
Year Completed199927 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
23.2083°N, 119.4214°E澎湖縣 · 七美鄉

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

烏溝蓄水塘 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

Total capacity is the total physical volume of the reservoir basin.

In contrast, effective storage refers to the usable volume available for public, agricultural, or power supply above dead storage and sediment levels.