東湧水庫

ID: 50309Offshore islandsOff-stream Reservoir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 08:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

Storage ratioNormal Storage
84.9%

Effective storage: 7.2 10k m³ · Effective capacity: 8.5 10k m³

東湧水庫 real-time hydraulic engineering cross-section東湧水庫 real-time storage ratio is 84.9%.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 東湧水庫 is at 84.9% with a water level elevation of 17.49 m. Primary water supply covers Dongyin Township (Zhongliu and Lehua villages).

東湧水庫 (ID: 50309) is an official Off-stream Reservoir situated in the Dongyin Island Runoff System, operated and managed by Lienchiang County Water Plant. In operation since 1985, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 7.2 (10k m³), with a storage ratio of 84.9% and a real-time water level elevation of 17.49 meters.

Primary functional purposes include Dongyin Northern Frontier Island Municipal Water, Desalination Integration, with key regional supply coverage extending across Dongyin Township (Zhongliu and Lehua villages).

Primary Supply Area:Dongyin Township (Zhongliu and Lehua villages)
Dongyin Northern Frontier Island Municipal WaterDesalination Integration

Effective storage

7.2 10k m³

▼ -0 10k m³ (1 hr)

Water level

17.49 m

▼ -0.03 m (1 hr)

Inflow

N/A

Total outflow

0 m³/s

— 0.0 m³/s (1 hr)

Effective capacity

8.5 10k m³

Net Flow Balance

東湧水庫 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
N/AUpstream catchment runoff inflow rate
Total outflow (Qout)
0 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

All discharge gates closed (No flood release)
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

東湧水庫 · Engineering profile and geospatial information

Managing AgencyLienchiang County Water Plant
Responsible for facility operation and flood dispatch
Facility TypeOff-stream Reservoir
Dam structure and engineering classification
River SystemDongyin Island Runoff System
Primary catchment river basin and hydrological system
Effective capacity8.5 10k m³
Maximum designed water storage capacity of the dam
Year Completed198541 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
26.3639°N, 120.4967°E連江縣 · 東引鄉

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

東湧水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

Total capacity is the total physical volume of the reservoir basin.

In contrast, effective storage refers to the usable volume available for public, agricultural, or power supply above dead storage and sediment levels.