嘉南西口、烏山頭和八田 is classified under Hydro in Taipower's open dataset, currently reporting 1 unit(s): 嘉南西口、烏山頭和八田.
嘉南西口、烏山頭和八田
Real-time generation & historical load curve
Source: Taipower Open Data Download Service
Plant Overview
The Xikou, Wushantou, and Hatta plants are all located in Tainan City, attached to the Wushantou Reservoir at the heart of the Chianan Plain irrigation system (designed by engineer Yoichi Hatta), with power generation as a secondary function of irrigation water delivery.
嘉南西口、烏山頭和八田 (Hydro) currently reports a net generation of 10.6 MW across 1 unit(s), against an installed capacity of 13.7 MW (77.4% utilization).
Hydro plants can start or stop within seconds to minutes, making them one of the grid's fastest tools for frequency regulation and peak-shaving. The pumped-storage plants around Sun Moon Lake (Mingtan, Daguan) pump water uphill using off-peak electricity and release it to generate during peak demand, effectively acting as large-scale energy storage. Output is highly dependent on rainfall and reservoir levels.
Hydropower was Taiwan's earliest form of electricity generation, with several plants dating back to the Japanese colonial era. Because most viable river sites have already been developed, hydro capacity has grown little in recent decades and its share has been diluted by the rapid expansion of gas and solar. Its low-carbon, fast-dispatch characteristics nonetheless keep it strategically important for grid stability as variable renewables expand.
Overlay Comparison
Compare load curves and daily peak trends across periods; unlocks automatically once enough data accumulates.
Unit Details
| Unit | Fuel Type | Capacity | Net Generation | Utilization | Note |
|---|---|---|---|---|---|
| 嘉南西口、烏山頭和八田 | Hydro | 13.7 MW | 10.6 MW | 77.3% | — |