德基

Real-time generation & historical load curve

Source: Taipower Open Data Download Service

Latest source time: 09/18/2026 13:10
Net Generation
0 MW
Capacity
234 MW
Utilization: 0%
Fuel Type
Hydro
Units: 3

Plant Overview

Flagship Plant

Techi Power Plant is located on the upper reaches of the Dajia River in Heping District, Taichung City. The Techi Reservoir is the uppermost and highest-elevation major reservoir in the Dajia River hydro system, with its discharged water reused successively at the downstream Guguan and Tianlun plants.

The Deji Dam, completed in 1973, stands 180 meters tall — once Asia's highest double-curvature concrete arch dam and still Taiwan's tallest reservoir dam today. The power plant is built 270 meters underground on the dam's left bank, housing three vertical-shaft Francis turbine-generator units of 78,000kW each; since 1996 it has operated as a branch plant of the consolidated Dajia River Power Plant, alongside Qingshan and Guguan.

德基 (Hydro) currently reports a net generation of 0 MW across 3 unit(s), against an installed capacity of 234 MW (0% utilization).

Hydro plants can start or stop within seconds to minutes, making them one of the grid's fastest tools for frequency regulation and peak-shaving. The pumped-storage plants around Sun Moon Lake (Mingtan, Daguan) pump water uphill using off-peak electricity and release it to generate during peak demand, effectively acting as large-scale energy storage. Output is highly dependent on rainfall and reservoir levels.

Hydropower was Taiwan's earliest form of electricity generation, with several plants dating back to the Japanese colonial era. Because most viable river sites have already been developed, hydro capacity has grown little in recent decades and its share has been diluted by the rapid expansion of gas and solar. Its low-carbon, fast-dispatch characteristics nonetheless keep it strategically important for grid stability as variable renewables expand.

Overlay Comparison

Compare load curves and daily peak trends across periods; unlocks automatically once enough data accumulates.

One sample every 10 minutes, showing generation over the last 24 hours. The dashed line is the prior 24-hour period (same time yesterday) for day-over-day comparison.

Unit Details

UnitFuel TypeCapacityNet GenerationUtilizationNote
德基#1Hydro78 MW0 MW0%
德基#2Hydro78 MW0 MW0%
德基#3Hydro78 MW0 MW0%

Frequently Asked Questions

FAQ

德基 is classified under Hydro in Taipower's open dataset, currently reporting 3 unit(s): 德基#1, 德基#2, 德基#3.