鉅工

Real-time generation & historical load curve

Source: Taipower Open Data Download Service

Latest source time: 09/18/2026 13:10
Net Generation
5 MW
Capacity
43.6 MW
Utilization: 11.5%
Fuel Type
Hydro
Units: 2

Plant Overview

Plant

Jugong Power Plant is located in Nantou County, a downstream link in the Sun Moon Lake hydroelectric system that reuses water discharged from the Daguan plants to generate additional power.

鉅工 (Hydro) currently reports a net generation of 5 MW across 2 unit(s), against an installed capacity of 43.6 MW (11.5% utilization).

Hydro plants can start or stop within seconds to minutes, making them one of the grid's fastest tools for frequency regulation and peak-shaving. The pumped-storage plants around Sun Moon Lake (Mingtan, Daguan) pump water uphill using off-peak electricity and release it to generate during peak demand, effectively acting as large-scale energy storage. Output is highly dependent on rainfall and reservoir levels.

Hydropower was Taiwan's earliest form of electricity generation, with several plants dating back to the Japanese colonial era. Because most viable river sites have already been developed, hydro capacity has grown little in recent decades and its share has been diluted by the rapid expansion of gas and solar. Its low-carbon, fast-dispatch characteristics nonetheless keep it strategically important for grid stability as variable renewables expand.

Overlay Comparison

Compare load curves and daily peak trends across periods; unlocks automatically once enough data accumulates.

One sample every 10 minutes, showing generation over the last 24 hours. The dashed line is the prior 24-hour period (same time yesterday) for day-over-day comparison.

Unit Details

UnitFuel TypeCapacityNet GenerationUtilizationNote
鉅工#1Hydro21.8 MW2.4 MW11%
鉅工#2Hydro21.8 MW2.6 MW12%

Frequently Asked Questions

FAQ

鉅工 is classified under Hydro in Taipower's open dataset, currently reporting 2 unit(s): 鉅工#1, 鉅工#2.