榮華壩

ID: 10206NorthRun-of-river Weir

Real-time conditions and historical storage trends

Observed at: Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

榮華壩

💡 Silt Interception Dam: Acts as a sediment retention barrier and diversion intake for run-of-river power generation.

Facility OperationRegular Monitoring
N/A

Effective capacity: 6.4 10k m³ (Desilting & flood regulation) · Run-of-river facility · Primarily raises river level for diversion/water supply without storage ratio monitoring

榮華壩 real-time hydraulic engineering cross-section榮華壩 is a run-of-river facility or weir operating with steady throughflow regulation without storage percentage monitoring.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

榮華壩 (Run-of-river Weir) is a major hydraulic facility managed under the Water Resources Agency. Primary water supply covers Yixing Hydroelectric Station & Shimen Reservoir catchment.

榮華壩 (ID: 10206) is an official Run-of-river Weir situated in the Dahan River, Tamsui River System, operated and managed by Northern Region Water Resources Branch, WRA. In operation since 1983, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

Primary functional purposes include Yixing Hydroelectric Power, Upstream Sediment Interception, with key regional supply coverage extending across Yixing Hydroelectric Station & Shimen Reservoir catchment.

Primary Supply Area:Yixing Hydroelectric Station & Shimen Reservoir catchment
Yixing Hydroelectric PowerUpstream Sediment Interception

Water draw

N/A

Water level

N/A

Inflow

N/A

Total outflow

N/A

Catchment rainfall

N/A

Net Flow Balance

榮華壩 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
N/AUpstream catchment runoff inflow rate
Total outflow (Qout)
N/AGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

All discharge gates closed (No flood release)
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Hydrological Flow & Water Level History

Historical telemetry trends for inflow, outflow discharge, and live water level elevation.

Reservoir Specifications · Geographic Location

榮華壩 · Engineering profile and geospatial information

Managing AgencyNorthern Region Water Resources Branch, WRA
Responsible for facility operation and flood dispatch
Facility TypeRun-of-river Weir
Dam structure and engineering classification
River SystemDahan River, Tamsui River System
Primary catchment river basin and hydrological system
Effective capacity6.4 10k m³
Maximum designed water storage capacity of the dam
Year Completed198343 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
24.7892°N, 121.3653°E桃園市 · 復興區

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

榮華壩 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

💡 Silt Interception Dam: Acts as a sediment retention barrier and diversion intake for run-of-river power generation.