寶山第二水庫

ID: 10405NorthOff-stream Reservoir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 12:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

寶山第二水庫

Off-stream feature: Water intake can be halted during high turbidity flood peaks and resumed once water clarifies.

Storage ratioOverflowing
100.3%
▲ +0% (vs Yesterday)— 0.0% (1 hr)

Effective storage: 3,392.3 10k m³ · Effective capacity: 3,383.7 10k m³

寶山第二水庫 real-time hydraulic engineering cross-section寶山第二水庫 storage ratio is at 100.3%, exceeding 100% full capacity and naturally overflowing. Current total outflow is 3.05 cms.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 寶山第二水庫 is at 100.3% with a water level elevation of 151.44 m. Storage is up 0% compared to yesterday at the same time; current outflow is 3.1 m³/s. Primary water supply covers Hsinchu City, Zhubei, and Hsinchu Science Park.

寶山第二水庫 (ID: 10405) is an official Off-stream Reservoir situated in the Shizi Creek, Zhonggang River System, operated and managed by Northern Region Water Resources Branch, WRA. In operation since 2006, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 3,392.3 (10k m³), with a storage ratio of 100.3% and a real-time water level elevation of 151.44 meters. Current total discharge outflow rate is 3.1 m³/s. Operational flood-control status is currently designated as "Free overflow".

Primary functional purposes include Hsinchu Science Park Industrial Water, Hsinchu Municipal Water Supply, with key regional supply coverage extending across Hsinchu City, Zhubei, and Hsinchu Science Park.

Primary Supply Area:Hsinchu City, Zhubei, and Hsinchu Science Park
Hsinchu Science Park Industrial WaterHsinchu Municipal Water Supply

Effective storage

3,392.3 10k m³

▲ +0.2 10k m³ (vs Yesterday)

Water level

151.44 m

— 0.0 m (vs Yesterday)

Inflow

N/A

Total outflow

3.05 m³/s

— 0.0 m³/s (1 hr)

Effective capacity

3,383.7 10k m³

Net Flow Balance

寶山第二水庫 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
N/AUpstream catchment runoff inflow rate
Total outflow (Qout)
3.05 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

Active Release
Spillway outflowMain spillway gate release or crest free overflow
Open
3.05 m³/s
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

寶山第二水庫 · Engineering profile and geospatial information

Managing AgencyNorthern Region Water Resources Branch, WRA
Responsible for facility operation and flood dispatch
Facility TypeOff-stream Reservoir
Dam structure and engineering classification
River SystemShizi Creek, Zhonggang River System
Primary catchment river basin and hydrological system
Effective capacity3,383.7 10k m³
Maximum designed water storage capacity of the dam
Year Completed200620 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
24.7214°N, 121.0544°E新竹縣 · 寶山鄉

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

寶山第二水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

Off-stream feature: Water intake can be halted during high turbidity flood peaks and resumed once water clarifies.