鯉魚潭水庫

ID: 20101CentralOff-stream Reservoir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 12:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

鯉魚潭水庫

When storage reaches 100%, water naturally overflows through the unique sawtooth spillway without gates.

Storage ratioNormal Storage
96.6%
▲ +0.1% (vs Yesterday)▼ -0% (1 hr)

Effective storage: 11,150.1 10k m³ · Effective capacity: 11,548.6 10k m³

鯉魚潭水庫 real-time hydraulic engineering cross-section鯉魚潭水庫 real-time storage ratio is 96.5%, total outflow is 2.31 cms.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 鯉魚潭水庫 is at 96.6% with a water level elevation of 299.07 m. Storage is up 0.1% compared to yesterday at the same time; outflow (2.3 m³/s) exceeds inflow (0 m³/s) during regulated release. Primary water supply covers Miaoli County and Greater Taichung metropolitan area.

鯉魚潭水庫 (ID: 20101) is an official Off-stream Reservoir situated in the Jingshan Creek, Da’an River System, operated and managed by Central Region Water Resources Branch, WRA. In operation since 1992, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 11,150.1 (10k m³), with a storage ratio of 96.6% and a real-time water level elevation of 299.07 meters. Hydraulic telemetry indicates an inflow of 0 m³/s and an outflow of 2.3 m³/s (net flow: -2.31 m³/s), actively conducting scheduled water supply and flood-control releases. Operational flood-control status is currently designated as "-1".

Primary functional purposes include Greater Taichung & Miaoli Public Water, Hydropower, Irrigation & Flood Control, with key regional supply coverage extending across Miaoli County and Greater Taichung metropolitan area.

Primary Supply Area:Miaoli County and Greater Taichung metropolitan area
Greater Taichung & Miaoli Public WaterHydropowerIrrigation & Flood Control

Effective storage

11,150.1 10k m³

▲ +12.8 10k m³ (vs Yesterday)

Water level

299.07 m

▲ +0.03 m (vs Yesterday)

Inflow

0 m³/s

▼ -18.82 m³/s (1 hr)

Total outflow

2.31 m³/s

— 0.0 m³/s (1 hr)

Effective capacity

11,548.6 10k m³

Net Flow Balance

鯉魚潭水庫 · Real-time hydrological balance and storage dispatch analysis

Net Outflow (Draining)
Inflow (Qin)
0 m³/sUpstream catchment runoff inflow rate
Total outflow (Qout)
2.31 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
-2.31 m³/sOutflow exceeds inflow during regulated discharge

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

Active Release
Spillway outflowMain spillway gate release or crest free overflow
Closed
24h 待命常閉
0 m³/s
Power outletHydroelectric turbine power generation discharge
Open
2.31 m³/s
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
Open
4.1 m³/s
Other outflowEcological baseflow or auxiliary facility release
Closed
24h 待命常閉
0 m³/s

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

鯉魚潭水庫 · Engineering profile and geospatial information

Managing AgencyCentral Region Water Resources Branch, WRA
Responsible for facility operation and flood dispatch
Facility TypeOff-stream Reservoir
Dam structure and engineering classification
River SystemJingshan Creek, Da’an River System
Primary catchment river basin and hydrological system
Effective capacity11,548.6 10k m³
Maximum designed water storage capacity of the dam
Year Completed199234 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
24.3547°N, 120.7761°E苗栗縣 · 三義鄉

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

鯉魚潭水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

When storage reaches 100%, water naturally overflows through the unique sawtooth spillway without gates.