德基水庫

ID: 20201CentralOn-stream Reservoir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 12:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

德基水庫

Headwaters of Dajia cascade, releases are coordinated for optimal power generation and downstream regional water security.

Storage ratioNormal Storage
97.8%
▲ +0.6% (vs Yesterday)▲ +0.1% (1 hr)

Effective storage: 17,762.9 10k m³ · Effective capacity: 18,154.9 10k m³

德基水庫 real-time hydraulic engineering cross-section德基水庫 real-time storage ratio is 97.8%, total outflow is 0.98 cms.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 德基水庫 is at 97.8% with a water level elevation of 1,407.06 m. Storage is up 0.6% compared to yesterday at the same time; inflow (26.8 m³/s) exceeds outflow (1 m³/s), resulting in net storage gain. Primary water supply covers Greater Taichung and downstream cascade hydroelectric stations.

德基水庫 (ID: 20201) is an official On-stream Reservoir situated in the Dajia River System, operated and managed by Taiwan Power Company. In operation since 1974, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 17,762.9 (10k m³), with a storage ratio of 97.8% and a real-time water level elevation of 1,407.06 meters. Hydraulic flow metrics record an inflow of 26.8 m³/s against an outflow of 1 m³/s (net flow: +25.81 m³/s), indicating active reservoir refilling.

Primary functional purposes include Dajia River Cascade Hydropower, Greater Taichung Municipal & Agricultural Water, Flood Control, with key regional supply coverage extending across Greater Taichung and downstream cascade hydroelectric stations.

Primary Supply Area:Greater Taichung and downstream cascade hydroelectric stations
Dajia River Cascade HydropowerGreater Taichung Municipal & Agricultural WaterFlood Control

Effective storage

17,762.9 10k m³

▲ +99.7 10k m³ (vs Yesterday)

Water level

1,407.06 m

▲ +0.24 m (vs Yesterday)

Inflow

26.79 m³/s

▼ -0.25 m³/s (1 hr)

Total outflow

0.98 m³/s

— 0.0 m³/s (1 hr)

Effective capacity

18,154.9 10k m³

Net Flow Balance

德基水庫 · Real-time hydrological balance and storage dispatch analysis

Net Inflow (Filling)
Inflow (Qin)
26.79 m³/sUpstream catchment runoff inflow rate
Total outflow (Qout)
0.98 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
+25.81 m³/sInflow exceeds outflow; storage volume is increasing

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

Active Release
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
Closed
0 m³/s
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
Open
0.98 m³/s

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

德基水庫 · Engineering profile and geospatial information

Managing AgencyTaiwan Power Company
Responsible for facility operation and flood dispatch
Facility TypeOn-stream Reservoir
Dam structure and engineering classification
River SystemDajia River System
Primary catchment river basin and hydrological system
Effective capacity18,154.9 10k m³
Maximum designed water storage capacity of the dam
Year Completed197452 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
24.2542°N, 121.1611°E台中市 · 和平區

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

德基水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

Headwaters of Dajia cascade, releases are coordinated for optimal power generation and downstream regional water security.