石岡壩

ID: 20202CentralRun-of-river Weir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 12:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

石岡壩

Run-of-river control weir: regulates daily intake directly from upstream Dajia River cascade releases.

Facility OperationRun-of-River Operating
40.15 m³/sCurrent Inflow Rate

Effective capacity: 120.2 10k m³ (Desilting & flood regulation) · Run-of-river facility · Primarily raises river level for diversion/water supply without storage ratio monitoring

石岡壩 real-time hydraulic engineering cross-section石岡壩 is a run-of-river facility or weir operating with steady throughflow regulation without storage percentage monitoring.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 石岡壩 is at 58.5% with a water level elevation of 273.53 m. Storage is up 0.3% compared to yesterday at the same time (rising 0.3% in the past hour). Primary water supply covers Greater Taichung Metropolitan Area via Fengyuan Water Treatment Plant.

石岡壩 (ID: 20202) is an official Run-of-river Weir situated in the Dajia River System, operated and managed by Central Region Water Resources Branch, WRA. In operation since 1977, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 70.3 (10k m³), with a storage ratio of 58.5% and a real-time water level elevation of 273.53 meters.

Primary functional purposes include Taichung Metropolitan Water & Irrigation Intake, with key regional supply coverage extending across Greater Taichung Metropolitan Area via Fengyuan Water Treatment Plant.

Primary Supply Area:Greater Taichung Metropolitan Area via Fengyuan Water Treatment Plant
Taichung Metropolitan Water & Irrigation Intake

Water draw

N/A

Water level

273.53 m

▲ +0.01 m (vs Yesterday)

Inflow

40.15 m³/s

▲ +1.74 m³/s (1 hr)

Total outflow

N/A

Catchment rainfall

0 mm

Net Flow Balance

石岡壩 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
40.15 m³/sUpstream catchment runoff inflow rate
Total outflow (Qout)
N/AGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

All discharge gates closed (No flood release)
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Hydrological Flow & Water Level History

Historical telemetry trends for inflow, outflow discharge, and live water level elevation.

Reservoir Specifications · Geographic Location

石岡壩 · Engineering profile and geospatial information

Managing AgencyCentral Region Water Resources Branch, WRA
Responsible for facility operation and flood dispatch
Facility TypeRun-of-river Weir
Dam structure and engineering classification
River SystemDajia River System
Primary catchment river basin and hydrological system
Effective capacity120.2 10k m³
Maximum designed water storage capacity of the dam
Year Completed197749 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
24.2794°N, 120.7769°E台中市 · 石岡區

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

石岡壩 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

Run-of-river control weir: regulates daily intake directly from upstream Dajia River cascade releases.