集集攔河堰

ID: 20503CentralRun-of-river Weir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 12:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

集集攔河堰

💡 Weir Characteristics: This is a run-of-river diversion weir rather than a deep storage reservoir. Storage varies drastically with daily river flows.

Facility OperationRun-of-River Operating
101.57 m³/sCurrent Inflow Rate

Effective capacity: 713.8 10k m³ (Desilting & flood regulation) · Run-of-river facility · Primarily raises river level for diversion/water supply without storage ratio monitoring

集集攔河堰 real-time hydraulic engineering cross-section集集攔河堰 is a run-of-river facility or weir operating with steady throughflow regulation without storage percentage monitoring. Current total outflow is 14.17 cms.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 集集攔河堰 is at 61.4% with a water level elevation of 213.1 m. Storage is down 2.2% compared to yesterday at the same time (falling 0.9% in the past hour); inflow (101.6 m³/s) exceeds outflow (14.2 m³/s), resulting in net storage gain. Primary water supply covers Changhua and Yunlin Plains for agriculture, municipal, and industrial users.

集集攔河堰 (ID: 20503) is an official Run-of-river Weir situated in the Zhuoshui River System, operated and managed by Central Region Water Resources Branch, WRA. In operation since 2001, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 438.2 (10k m³), with a storage ratio of 61.4% and a real-time water level elevation of 213.1 meters. Hydraulic flow metrics record an inflow of 101.6 m³/s against an outflow of 14.2 m³/s (net flow: +87.4 m³/s), indicating active reservoir refilling.

Primary functional purposes include Changhua & Yunlin Agricultural Irrigation, Municipal & Industrial Water Intake, with key regional supply coverage extending across Changhua and Yunlin Plains for agriculture, municipal, and industrial users.

Primary Supply Area:Changhua and Yunlin Plains for agriculture, municipal, and industrial users
Changhua & Yunlin Agricultural IrrigationMunicipal & Industrial Water Intake

Water draw

N/A

Water level

213.1 m

▼ -0.1 m (vs Yesterday)

Inflow

101.57 m³/s

▼ -13.34 m³/s (1 hr)

Total outflow

14.17 m³/s

▼ -0.06 m³/s (1 hr)

Catchment rainfall

0 mm

Net Flow Balance

集集攔河堰 · Real-time hydrological balance and storage dispatch analysis

Net Inflow (Filling)
Inflow (Qin)
101.57 m³/sUpstream catchment runoff inflow rate
Total outflow (Qout)
14.17 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
+87.4 m³/sInflow exceeds outflow; storage volume is increasing

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

Active Release
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Hydrological Flow & Water Level History

Historical telemetry trends for inflow, outflow discharge, and live water level elevation.

Reservoir Specifications · Geographic Location

集集攔河堰 · Engineering profile and geospatial information

Managing AgencyCentral Region Water Resources Branch, WRA
Responsible for facility operation and flood dispatch
Facility TypeRun-of-river Weir
Dam structure and engineering classification
River SystemZhuoshui River System
Primary catchment river basin and hydrological system
Effective capacity713.8 10k m³
Maximum designed water storage capacity of the dam
Year Completed200125 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
23.8267°N, 120.7578°E南投縣 · 集集鎮

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

集集攔河堰 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

💡 Weir Characteristics: This is a run-of-river diversion weir rather than a deep storage reservoir. Storage varies drastically with daily river flows.