白河水庫

ID: 30401SouthFlood-control Reservoir

Real-time conditions and historical storage trends

Observed at: 11/01/2026 08:00Daily operation date: 10/31/2026 08:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

白河水庫

During heavy rainfall, hydraulic desilting tunnels are activated to flush silt downstream.

Storage ratioNormal Storage
15%
▼ -44.6% (1 hr)

Effective storage: 215 10k m³ · Effective capacity: 1,436.3 10k m³

白河水庫 real-time hydraulic engineering cross-section白河水庫 real-time storage ratio is 15.0%.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 白河水庫 is at 15% with a water level elevation of 105.47 m. (falling 44.6% in the past hour) Primary water supply covers Baihe, Houbi, and Dongshan agricultural areas in Tainan.

白河水庫 (ID: 30401) is an official Flood-control Reservoir situated in the Baishui Creek, Jishui River System, operated and managed by Irrigation Agency Chianan Management Office. In operation since 1965, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 215 (10k m³), with a storage ratio of 15% and a real-time water level elevation of 105.47 meters.

Primary functional purposes include Agricultural Irrigation for Baihe & Dongshan, Hydraulic Desilting, Water Supply, with key regional supply coverage extending across Baihe, Houbi, and Dongshan agricultural areas in Tainan.

Primary Supply Area:Baihe, Houbi, and Dongshan agricultural areas in Tainan
Agricultural Irrigation for Baihe & DongshanHydraulic DesiltingWater Supply

Effective storage

215 10k m³

▼ -640 10k m³ (1 hr)

Water level

105.47 m

▼ -0.09 m (1 hr)

Inflow

N/A

Total outflow

N/A

Effective capacity

1,436.3 10k m³

Net Flow Balance

白河水庫 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
N/AUpstream catchment runoff inflow rate
Total outflow (Qout)
N/AGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

All discharge gates closed (No flood release)
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

白河水庫 · Engineering profile and geospatial information

Managing AgencyIrrigation Agency Chianan Management Office
Responsible for facility operation and flood dispatch
Facility TypeFlood-control Reservoir
Dam structure and engineering classification
River SystemBaishui Creek, Jishui River System
Primary catchment river basin and hydrological system
Effective capacity1,436.3 10k m³
Maximum designed water storage capacity of the dam
Year Completed196561 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
23.3517°N, 120.4950°E台南市 · 白河區

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

白河水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

During heavy rainfall, hydraulic desilting tunnels are activated to flush silt downstream.