曾文水庫

ID: 30502SouthOn-stream Reservoir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 12:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

曾文水庫

Huge retention capacity. Releases generate power before feeding into downstream Wushantou Reservoir. Equipped with major sediment bypass tunnels.

Storage ratioOverflowing
104.2%
▲ +0.1% (vs Yesterday)— 0.0% (1 hr)

Effective storage: 48,748 10k m³ · Effective capacity: 46,799 10k m³

曾文水庫 real-time hydraulic engineering cross-section曾文水庫 storage ratio is at 104.2%, exceeding 100% full capacity and naturally overflowing. Current total outflow is 0.02 cms.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 曾文水庫 is at 104.2% with a water level elevation of 230.05 m. Storage is up 0.1% compared to yesterday at the same time; inflow (19.9 m³/s) exceeds outflow (0 m³/s), resulting in net storage gain. Primary water supply covers Chiayi and Tainan regions, interconnected with Wushantou and Nanhua reservoirs.

曾文水庫 (ID: 30502) is an official On-stream Reservoir situated in the Zengwen River System, operated and managed by Southern Region Water Resources Branch, WRA. In operation since 1973, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 48,748 (10k m³), with a storage ratio of 104.2% and a real-time water level elevation of 230.05 meters. Hydraulic flow metrics record an inflow of 19.9 m³/s against an outflow of 0 m³/s (net flow: +19.89 m³/s), indicating active reservoir refilling. Catchment area recorded 0.8 mm of rainfall today.

Primary functional purposes include Chianan Plain Agricultural Irrigation, Southern Taiwan Municipal & Industrial Water, Hydroelectric Power, Flood Retention, with key regional supply coverage extending across Chiayi and Tainan regions, interconnected with Wushantou and Nanhua reservoirs.

Primary Supply Area:Chiayi and Tainan regions, interconnected with Wushantou and Nanhua reservoirs
Chianan Plain Agricultural IrrigationSouthern Taiwan Municipal & Industrial WaterHydroelectric PowerFlood Retention

Effective storage

48,748 10k m³

▲ +37 10k m³ (vs Yesterday)

Water level

230.05 m

▲ +0.02 m (vs Yesterday)

Inflow

19.91 m³/s

— 0.0 m³/s (1 hr)

Total outflow

0.02 m³/s

— 0.0 m³/s (1 hr)

Effective capacity

46,799 10k m³

Net Flow Balance

曾文水庫 · Real-time hydrological balance and storage dispatch analysis

Net Inflow (Filling)
Inflow (Qin)
19.91 m³/sUpstream catchment runoff inflow rate
Total outflow (Qout)
0.02 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
+19.89 m³/sInflow exceeds outflow; storage volume is increasing

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

Active Release
Spillway outflowMain spillway gate release or crest free overflow
Closed
24h 待命常閉
0 m³/s
Power outletHydroelectric turbine power generation discharge
Closed
0 m³/s
Desilting tunnelBottom desilting and sediment bypass tunnel
Closed
24h 待命常閉
0 m³/s
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
Closed
0 m³/s

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

曾文水庫 · Engineering profile and geospatial information

Managing AgencySouthern Region Water Resources Branch, WRA
Responsible for facility operation and flood dispatch
Facility TypeOn-stream Reservoir
Dam structure and engineering classification
River SystemZengwen River System
Primary catchment river basin and hydrological system
Effective capacity46,799 10k m³
Maximum designed water storage capacity of the dam
Year Completed197353 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
23.2508°N, 120.5369°E嘉義縣 · 大埔鄉

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

曾文水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

Huge retention capacity. Releases generate power before feeding into downstream Wushantou Reservoir. Equipped with major sediment bypass tunnels.