Effective storage
N/A
— 0.0 10k m³ (vs Yesterday)Real-time conditions and historical storage trends
Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets
Effective capacity: 8,180.9 10k m³ (Desilting & flood regulation) · Run-of-river facility · Primarily raises river level for diversion/water supply without storage ratio monitoring
南化水庫 (Off-stream Reservoir) is a major hydraulic facility managed under the Water Resources Agency. (falling 0.2% in the past hour) Primary water supply covers Core municipal water for Tainan, with bidirectional backup pipelines to Kaohsiung.
南化水庫 (ID: 30503) is an official Off-stream Reservoir situated in the Houku Creek, Zengwen River System, operated and managed by Taiwan Water Corporation 6th District Management Office. In operation since 1993, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.
Primary functional purposes include Tainan and Kaohsiung Public Water Supply, with key regional supply coverage extending across Core municipal water for Tainan, with bidirectional backup pipelines to Kaohsiung.
Effective storage
N/A
— 0.0 10k m³ (vs Yesterday)Water level
N/A
— 0.0 m (vs Yesterday)Inflow
N/A
▼ -1.05 m³/s (1 hr)Total outflow
N/A
— 0.0 m³/s (1 hr)Effective capacity
8,180.9 10k m³
南化水庫 · Real-time hydrological balance and storage dispatch analysis
Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.
View historical storage percentage and water volume trends over time.
南化水庫 · Engineering profile and geospatial information
Check real-time conditions and historical trends for other facilities in the same region.
南化水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations
Total capacity is the total physical volume of the reservoir basin.
In contrast, effective storage refers to the usable volume available for public, agricultural, or power supply above dead storage and sediment levels.