烏山頭水庫

ID: 30501SouthOff-stream Reservoir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 07:00Daily operation date: 09/17/2026 07:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

Storage ratioNormal Storage
86.3%
▼ -2.6% (1 hr)

Effective storage: 6,801 10k m³ · Effective capacity: 7,885.2 10k m³

烏山頭水庫 real-time hydraulic engineering cross-section烏山頭水庫 real-time storage ratio is 86.3%.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 烏山頭水庫 is at 86.3% with a water level elevation of 57.06 m. (falling 2.6% in the past hour) Primary water supply covers Chianan Plain farms and Tainan metropolitan water supply.

烏山頭水庫 (ID: 30501) is an official Off-stream Reservoir situated in the Guantian Creek, Zengwen River System, operated and managed by Irrigation Agency Chianan Management Office. In operation since 1930, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 6,801 (10k m³), with a storage ratio of 86.3% and a real-time water level elevation of 57.06 meters.

Primary functional purposes include Chianan Canal Irrigation, Tainan Municipal & Industrial Water Supply, with key regional supply coverage extending across Chianan Plain farms and Tainan metropolitan water supply.

Primary Supply Area:Chianan Plain farms and Tainan metropolitan water supply
Chianan Canal IrrigationTainan Municipal & Industrial Water Supply

Effective storage

6,801 10k m³

▼ -203 10k m³ (1 hr)

Water level

57.06 m

▼ -0.22 m (1 hr)

Inflow

N/A

Total outflow

N/A

Effective capacity

7,885.2 10k m³

Net Flow Balance

烏山頭水庫 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
N/AUpstream catchment runoff inflow rate
Total outflow (Qout)
N/AGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

All discharge gates closed (No flood release)
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
N/A

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

烏山頭水庫 · Engineering profile and geospatial information

Managing AgencyIrrigation Agency Chianan Management Office
Responsible for facility operation and flood dispatch
Facility TypeOff-stream Reservoir
Dam structure and engineering classification
River SystemGuantian Creek, Zengwen River System
Primary catchment river basin and hydrological system
Effective capacity7,885.2 10k m³
Maximum designed water storage capacity of the dam
Year Completed193096 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
23.2003°N, 120.3667°E台南市 · 官田區

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

烏山頭水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

Total capacity is the total physical volume of the reservoir basin.

In contrast, effective storage refers to the usable volume available for public, agricultural, or power supply above dead storage and sediment levels.