高屏溪攔河堰

ID: 30901SouthRun-of-river Weir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 12:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

高屏溪攔河堰

💡 Why is storage ratio N/A? Answer: Gaoping Weir is a run-of-river diversion weir without deep storage capacity. It routes river flow directly into municipal treatment plants, so storage percentage is not applicable.

Facility OperationRun-of-River Operating
6.02 m³/sWater draw

Run-of-river facility · Primarily raises river level for diversion/water supply without storage ratio monitoring

高屏溪攔河堰 real-time hydraulic engineering cross-section高屏溪攔河堰 is a run-of-river facility or weir operating with steady throughflow regulation without storage percentage monitoring. Current total outflow is 85.08 cms.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water level for 高屏溪攔河堰 is at 16.55 m.; inflow (91.1 m³/s) exceeds outflow (85.1 m³/s), resulting in net storage gain. Primary water supply covers Greater Kaohsiung (supplying Pingding, Kaotan, and Chengcing Lake water treatment plants).

高屏溪攔河堰 (ID: 30901) is an official Run-of-river Weir situated in the Mainstream Gaoping River System, operated and managed by Southern Region Water Resources Branch, WRA. In operation since 1999, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

Current real-time water level elevation stands at 16.55 meters. Hydraulic flow metrics record an inflow of 91.1 m³/s against an outflow of 85.1 m³/s (net flow: +6.02 m³/s), indicating active reservoir refilling.

Primary functional purposes include Greater Kaohsiung Municipal Water Supply, Industrial Water Supply, with key regional supply coverage extending across Greater Kaohsiung (supplying Pingding, Kaotan, and Chengcing Lake water treatment plants).

Primary Supply Area:Greater Kaohsiung (supplying Pingding, Kaotan, and Chengcing Lake water treatment plants)
Greater Kaohsiung Municipal Water SupplyIndustrial Water Supply

Water draw

6.02 m³/s

Water level

16.55 m

▲ +0.44 m (vs Yesterday)

Inflow

91.1 m³/s

— 0.0 m³/s (1 hr)

Total outflow

85.08 m³/s

— 0.0 m³/s (1 hr)

Catchment rainfall

0 mm

Net Flow Balance

高屏溪攔河堰 · Real-time hydrological balance and storage dispatch analysis

Net Inflow (Filling)
Inflow (Qin)
91.1 m³/sUpstream catchment runoff inflow rate
Total outflow (Qout)
85.08 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
+6.02 m³/sInflow exceeds outflow; storage volume is increasing

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

Active Release
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
Open
6.02 m³/s
Other outflowEcological baseflow or auxiliary facility release
Open
85.08 m³/s

Hydrological Flow & Water Level History

Historical telemetry trends for inflow, outflow discharge, and live water level elevation.

Reservoir Specifications · Geographic Location

高屏溪攔河堰 · Engineering profile and geospatial information

Managing AgencySouthern Region Water Resources Branch, WRA
Responsible for facility operation and flood dispatch
Facility TypeRun-of-river Weir
Dam structure and engineering classification
River SystemMainstream Gaoping River System
Primary catchment river basin and hydrological system
Effective capacityRun-of-river (No storage basin)
Maximum designed water storage capacity of the dam
Year Completed199927 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
22.6842°N, 120.4344°E高雄市 · 大樹區

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

高屏溪攔河堰 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

💡 Why is storage ratio N/A? Answer: Gaoping Weir is a run-of-river diversion weir without deep storage capacity. It routes river flow directly into municipal treatment plants, so storage percentage is not applicable.