西勢水庫

ID: 10203NorthOn-stream Reservoir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 07:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

Storage ratioNormal Storage
90.5%
▼ -2.7% (vs Yesterday)▼ -2.7% (1 hr)

Effective storage: 35.8 10k m³ · Effective capacity: 39.6 10k m³

西勢水庫 real-time hydraulic engineering cross-section西勢水庫 real-time storage ratio is 90.5%.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 西勢水庫 is at 90.5% with a water level elevation of 71.85 m. Storage is down 2.7% compared to yesterday at the same time (falling 2.7% in the past hour). Primary water supply covers Nuannuan, Qidu, and parts of Keelung City.

西勢水庫 (ID: 10203) is an official On-stream Reservoir situated in the Xishi Creek, Keelung River System, operated and managed by Taiwan Water Corporation 1st District Management Office. In operation since 1926, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 35.8 (10k m³), with a storage ratio of 90.5% and a real-time water level elevation of 71.85 meters.

Primary functional purposes include Keelung Municipal Water Supply, Water Catchment Conservation, with key regional supply coverage extending across Nuannuan, Qidu, and parts of Keelung City.

Primary Supply Area:Nuannuan, Qidu, and parts of Keelung City
Keelung Municipal Water SupplyWater Catchment Conservation

Effective storage

35.8 10k m³

▼ -1.1 10k m³ (vs Yesterday)

Water level

71.85 m

▼ -0.13 m (vs Yesterday)

Inflow

N/A

Total outflow

0 m³/s

— 0.0 m³/s (1 hr)

Effective capacity

39.6 10k m³

Net Flow Balance

西勢水庫 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
N/AUpstream catchment runoff inflow rate
Total outflow (Qout)
0 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

All discharge gates closed (No flood release)
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Historical Storage Trends

View historical storage percentage and water volume trends over time.

Reservoir Specifications · Geographic Location

西勢水庫 · Engineering profile and geospatial information

Managing AgencyTaiwan Water Corporation 1st District Management Office
Responsible for facility operation and flood dispatch
Facility TypeOn-stream Reservoir
Dam structure and engineering classification
River SystemXishi Creek, Keelung River System
Primary catchment river basin and hydrological system
Effective capacity39.6 10k m³
Maximum designed water storage capacity of the dam
Year Completed1926100 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
25.0883°N, 121.7397°E基隆市 · 暖暖區

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

西勢水庫 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

Total capacity is the total physical volume of the reservoir basin.

In contrast, effective storage refers to the usable volume available for public, agricultural, or power supply above dead storage and sediment levels.