直潭壩

ID: 10212NorthRun-of-river Weir

Real-time conditions and historical storage trends

Observed at: 09/18/2026 07:00Daily operation date: 09/17/2026 00:00

Source: Water Resources Agency Reservoir Conditions and Daily Reservoir Operations datasets

💡 Operational Notes & FAQ

直潭壩

💡 Operational note: Maintains a steady head to continuously feed the Zhitam Water Treatment Plant from upstream releases.

Facility OperationRegular Monitoring
44.4 mLive Water Level

Effective capacity: 175 10k m³ (Desilting & flood regulation) · Run-of-river facility · Primarily raises river level for diversion/water supply without storage ratio monitoring

直潭壩 real-time hydraulic engineering cross-section直潭壩 is a run-of-river facility or weir operating with steady throughflow regulation without storage percentage monitoring.

Real-time Hydraulic Briefing

Synthesized water storage and flow dynamics

Current water storage for 直潭壩 is at 87.8% with a water level elevation of 44.4 m. Storage is up 2.3% compared to yesterday at the same time (rising 2.3% in the past hour). Primary water supply covers Zhitam Treatment Plant serving over 4 million residents in Greater Taipei.

直潭壩 (ID: 10212) is an official Run-of-river Weir situated in the Xindian River, Tamsui River System, operated and managed by Taipei Water Department. In operation since 1984, this facility serves as a vital strategic pillar in Taiwan's regional water grid and flood mitigation network.

According to the latest observation, its effective water storage is approximately 153.7 (10k m³), with a storage ratio of 87.8% and a real-time water level elevation of 44.4 meters. Catchment area recorded 0.5 mm of rainfall today.

Primary functional purposes include Core Municipal Raw Water Intake for Greater Taipei, with key regional supply coverage extending across Zhitam Treatment Plant serving over 4 million residents in Greater Taipei.

Primary Supply Area:Zhitam Treatment Plant serving over 4 million residents in Greater Taipei
Core Municipal Raw Water Intake for Greater Taipei

Water draw

N/A

Water level

44.4 m

▲ +0.06 m (vs Yesterday)

Inflow

N/A

Total outflow

0 m³/s

— 0.0 m³/s (1 hr)

Catchment rainfall

0.5 mm

Net Flow Balance

直潭壩 · Real-time hydrological balance and storage dispatch analysis

Inflow (Qin)
N/AUpstream catchment runoff inflow rate
Total outflow (Qout)
0 m³/sGate release and flood desilting rate
Net Flow Balance (ΔQ)
N/AOfficial real-time inflow/outflow telemetry unavailable

24 小時水文吞吐平衡走勢

雙向對稱流量觀測(上方為上游入流,下方為大壩放流,穿梭折線為淨出入差額)

Discharge Gates & Facilities

Real-time telemetry for spillways, drainage tunnels, desilting tunnels, and power outlets.

All discharge gates closed (No flood release)
Spillway outflowMain spillway gate release or crest free overflow
N/A
24h 待命常閉
N/A
Power outletHydroelectric turbine power generation discharge
N/A
24h 待命常閉
N/A
Desilting tunnelBottom desilting and sediment bypass tunnel
N/A
24h 待命常閉
N/A
Drainage tunnelDedicated flood diversion tunnel release
N/A
24h 待命常閉
N/A
Water drawMunicipal water, industrial, or irrigation draw
N/A
24h 待命常閉
N/A
Other outflowEcological baseflow or auxiliary facility release
N/A
24h 待命常閉
N/A

Hydrological Flow & Water Level History

Historical telemetry trends for inflow, outflow discharge, and live water level elevation.

Reservoir Specifications · Geographic Location

直潭壩 · Engineering profile and geospatial information

Managing AgencyTaipei Water Department
Responsible for facility operation and flood dispatch
Facility TypeRun-of-river Weir
Dam structure and engineering classification
River SystemXindian River, Tamsui River System
Primary catchment river basin and hydrological system
Effective capacity175 10k m³
Maximum designed water storage capacity of the dam
Year Completed198442 yrs in operation
Long-term water supply security and flood resilience
Geographic Location
24.9408°N, 121.5483°E新北市 · 新店區

Check real-time conditions and historical trends for other facilities in the same region.

Frequently Asked Questions

直潭壩 · Key insights into reservoir metrics, release mechanisms, and facility operations

FAQ

💡 Operational note: Maintains a steady head to continuously feed the Zhitam Water Treatment Plant from upstream releases.